Course Name |
Duration (Days) |
Certificate |
Register Now |
Geosteering of Horizontal Well Test |
5 Days |
EDS |
|
Petroleum Geochemistry |
5 Days |
EDS |
|
Fault Seal Analysis |
5 Days |
EDS |
|
Risk Analysis in Exploration & Field Development |
5 Days |
EDS |
|
Development Geology |
5 Days |
EDS |
|
Basic of 3D Seismic Interpretation |
5 Days |
EDS |
|
Seismic Attributes and AVO Analysis |
5 Days |
EDS |
|
Basic Structural Geology |
5 Days |
EDS |
|
Reservoir Geology |
5 Days |
EDS |
|
Fracture & Faults |
5 Days |
EDS |
|
Foundation Petrophysics |
5 Days |
EDS |
|
Advanced Petrophysics * NEW |
5 Days |
EDS |
|
Integration of Rocks, log and production |
5 Days |
EDS |
|
Integrated Petrophysical Modeling |
5 Days |
EDS |
|
G&G Skills |
5 Days |
EDS |
|
Rock Mechanics |
5 Days |
EDS |
|
Sequence Stratigraphy |
5 Days |
EDS |
|
Fundamentals of Nano Planktons & their applications |
5 Days |
EDS |
|
Geology for non-Geologists |
5 Days |
EDS |
|
Applied Petroleum Geology |
5 Days |
EDS |
|
Carbonate and Clastic Reservoir Geology |
5 Days |
EDS |
|
Operation and Wellsite Geology |
5 Days |
EDS |
|
Basin System Analysis |
5 Days |
EDS |
|
Subsurface Mapping |
5 Days |
EDS |
|
Advanced Structural Geology |
5 Days |
EDS |
|
3D Reservoir Modeling using software |
5 Days |
EDS |
|
Reservoir Characterization |
5 Days |
EDS |
|
NMR Petro-physics using Software (S) |
5 Days |
EDS |
|
Cased Hole & Production Log Evaluation |
5 Days |
EDS |
|
Geo-Mechanics Application in Petroleum Industry (Drilling + Production) |
5 Days |
EDS |
|
Geo-Mechanics Application in Petroleum Industry(Exploration+ Reservoir) |
5 Days |
EDS |
|
Advanced Formation Evaluation |
5 Days |
EDS |
|
M/LWD |
5 Days |
EDS |
|
Routine Core Analysis “RCA” |
5 Days |
EDS |
|
Special Core Analysis “SCAL” |
5 Days |
EDS |
|
Artificial Lift Technology |
5 Days |
EDS |
|
Gas lifting |
5 Days |
EDS |
|
ESP |
5 Days |
EDS |
|
Beam Pump Operations |
5 Days |
EDS |
|
Completion and Production Engineering |
5 Days |
EDS |
|
Well Stimulation |
5 Days |
EDS |
|
Production Logging Tools |
5 Days |
EDS |
|
Perforation Methods |
5 Days |
EDS |
|
Dynamic Flow Analysis |
5 Days |
EDS |
|
Integrated pressure& production data analysis (S) KAPPA |
5 Days |
EDS |
|
Coiled tubing |
5 Days |
EDS |
|
Surface production Facilities |
5 Days |
EDS |
|
Sand Production Management |
5 Days |
EDS |
|
Oil and Gas Production Technology |
5 Days |
EDS |
|
Production Problem Solving |
5 Days |
EDS |
|
Advanced production and operation Techniques |
5 Days |
EDS |
|
Fundamentals of Petroleum Engineering |
5 Days |
EDS |
|
Integrated Field Development Analysis, Optimization and Forecasting PETEX* |
5 Days |
EDS |
|
Hydraulic Fracturing |
5 Days |
EDS |
|
Basic Reservoir Engineering |
5 Days |
EDS |
|
Advanced Reservoir Engineering |
5 Days |
EDS |
|
Water Flooding A:Z |
5 Days |
EDS |
|
Reservoir Management |
5 Days |
EDS |
|
Reservoir Simulation |
5 Days |
EDS |
|
Fundamentals of Reservoir Dynamic Modeling (S) |
5 Days |
EDS |
|
Fundamentals of Reservoir static Modeling (S) |
5 Days |
EDS |
|
Formation Damage |
5 Days |
EDS |
|
Eclipse & Petrel Reservoir Engineering (S) |
5 Days |
EDS |
|
Basics of Rocks Characterization & Core Analysis |
5 Days |
EDS |
|
Basic Well test analysis |
5 Days |
EDS |
|
Advanced Well test analysis |
5 Days |
EDS |
|
Oil and Gas Reserve Evaluation |
5 Days |
EDS |
|
Water Injection Design & Application |
5 Days |
EDS |
|
WellControl – IWCF Surface level 3,4 |
5 Days |
IWCF |
|
WellControl – IWCF Subsea level 3,4 |
5 Days |
IWCF |
|
Drilling Operations Introductory |
2 Days |
IADC – WellSharp |
|
Drilling Operations Introductory (Live) |
2 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Driller Surface Stack |
5 Days |
IADC – WellSharp |
|
Drilling Operations Driller (Live) Surface Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Driller (Live + KREW) Surface Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Drilling Operations Driller Combination Stack |
5 Days |
IADC – WellSharp |
|
Drilling Operations Driller (Live) Combination Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Driller (Live + KREW) Combination Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Drilling Operations Driller (Live) Subsea Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Driller (Live + KREW) Subsea Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Drilling Operations Supervisor Surface Stack |
5 Days |
IADC – WellSharp |
|
Drilling Operations Supervisor (Live) Surface Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Supervisor (Live + KREW) Surface Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Well Servicing Introductory |
2 Days |
IADC – WellSharp |
|
Well Servicing Coiled Tubing |
5 Days |
IADC – WellSharp |
|
Well Servicing Coiled Tubing (Live) |
5 Days |
IADC – WellSharp (LIVE) |
|
Well Servicing Snubbing |
5 Days |
IADC – WellSharp |
|
Well Servicing Snubbing (Live) |
5 Days |
IADC – WellSharp (LIVE) |
|
Well Servicing Wireline |
5 Days |
IADC – WellSharp |
|
Well Servicing Wireline (Live) |
5 Days |
IADC – WellSharp (LIVE) |
|
Well Servicing Oil and Gas Operator Representative |
5 Days |
IADC – WellSharp |
|
Well Servicing Oil and Gas Operator Representative (Live) |
5 Days |
IADC – WellSharp (LIVE) |
|
Well Servicing Workover |
5 Days |
IADC – WellSharp |
|
Well Servicing Workover (Live) |
5 Days |
IADC – WellSharp (LIVE) |
|
Well Servicing Subsea Supplement |
5 Days |
IADC – WellSharp |
|
Basic Mud School |
20 Days |
IADC – DIT |
|
Advanced Drilling Fluids |
10 Days |
IADC – DIT |
|
Advanced Directional Drilling Technology |
5 Days |
IADC – DIT |
|
Drilling Operations Supervisor Combination Stack |
5 Days |
IADC – WellSharp |
|
Drilling Operations Supervisor (Live) Combination Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Supervisor (Live + KREW) Combination Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Drilling Operations Supervisor (Live) Subsea Stack |
5 Days |
IADC – WellSharp (LIVE) |
|
Drilling Operations Supervisor (Live + KREW) Subsea Stack |
5 Days |
IADC – WellSharp (LIVE) + KREW |
|
Well Intervention |
5 Days |
IWCF |
|
Drilling Fluids & Mud systems |
5 Days |
EDS |
|
Deep Water Fluids |
5 Days |
EDS |
|
Advanced Oil Base Mud Calculation |
5 Days |
EDS |
|
Cementing Operation |
5 Days |
EDS |
|
MWD / LWD Tools & Petrophysics |
5 Days |
EDS |
|
Practical Fluids Testing(Lab) |
5 Days |
EDS |
|
Advanced Completion Fluids |
5 Days |
EDS |
|
Oil Field Familiarization |
3 Days |
EDS |
|
Mud School |
5 Days |
EDS |
|
Drilling Principles & Calculations |
5 Days |
EDS |
|
Hydraulics Calculations |
3 days |
EDS |
|
Well planning & Drilling Optimization |
5 Days |
EDS |
|
Well-Head Operations |
5 days |
EDS |
|
BHA Design |
3 Days |
EDS |
|
Well Design |
5 Days |
EDS |
|
Casing Design |
3 Days |
EDS |
|
Drilling Problems Solving |
5 Days |
EDS |
|
Under Balanced Drilling |
3 Days |
EDS |
|
Advanced Drilling Engineering |
5 days |
EDS |
|
HPHT |
5 Days |
EDS |
|
Solids Control |
3 Days |
EDS |
|
Advanced Logging Tools |
5 Days |
EDS |
|
Basic Mud Logging |
5 Days |
EDS |
|
Completion Design |
5 Days |
EDS |
|
Work-Over & Well Completion |
5 Days |
EDS |
|