• Home
  • About Us
  • MUD CHEMICALS
    • Water Based Mud (WBM)
    • Oil Based Mud (OBM)
    • Workover & Completion Fluids
    • Reservoir Stimulation
    • Specialty Products
  • TRAINING
    • HSE
    • Upstream
    • Downstream
    • Management, Finance & HR
  • CONSULTATION
  • E-Learning
    • Production
    • Reservoir
    • Geology
    • Geophysics
    • Petrophysicist
    • Operations Optimization
    • Operation and HSE
    • Drilling and Well Services
    • Facilities
    • Technical
    • Artificial Lift
  • CONTACT US
Skip to content
  • FAQ
  • HELP DESK
  • MY PROFILE
EDS Egyptian Drilling Skills
  • We are open!
    Sun-Thu 9:00-17:00
  • CALL US TODAY!
    +20 225179375 | +201116688166
​

0 items - £0.00 in cart

​

Cart

​
​
​ ​
  • Home
  • About Us
  • MUD CHEMICALS
    • Water Based Mud (WBM)
    • Oil Based Mud (OBM)
    • Workover & Completion Fluids
    • Reservoir Stimulation
    • Specialty Products
  • TRAINING
    • HSE
    • Upstream
    • Downstream
    • Management, Finance & HR
  • CONSULTATION
  • E-Learning
    • Production
    • Reservoir
    • Geology
    • Geophysics
    • Petrophysicist
    • Operations Optimization
    • Operation and HSE
    • Drilling and Well Services
    • Facilities
    • Technical
    • Artificial Lift
  • CONTACT US
Home / Drilling and Well Services / Drilling Fluids And Circulation System – Phase1
  • Phase 1
    13
    • Introduction
      01 min
    • Basic of geology & Drilling
      20 min
    • Basics Of Mud Engineering – Functions Of Drilling Fluids
      13 min
    • Basic Mud Chemistry
      09 min
    • Mud Formulation
      16 min
    • Clay Chemistry
      22 min
    • Polymer Chemistry
      30 min
    • Inhibition Mechanism
      09 min
    • Mud Types
      30 min
    • Rheology & Hydraulics
      30 min
    • Mud Calculation
      30 min
    • Fracture Gradients
      30 min
    • Drilling Fluids (Phase1) Final Exam
      3 questions01 hour 30 min

Drilling Fluids And Circulation System – Phase1

This content is protected, please login and enroll course to view this content!
Next Basic of geology & Drilling

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Home
  • /
  • Courses
  • /
  • Drilling Fluids And Circulation System – Phase1
EDS-Footer-Logo

565, Palestine Road, New Maadi,
Cairo, Egypt

CONTACT INFO

565, Palestine Road, New Maadi, Cairo.

Phone: +20 – 2 – 25179375

Mobile: +20 – 11 – 16688166

Fax: +20 – 2 – 25179374

Email: info@eds.com.eg

Web: eds.com.eg

ASK A QUESTION ?

    © Copyright - 2021  EDS  |   Powered by TECH VILLAGE
    Modal title

    Message modal